C46400 Naval Brass Tube Plates for UAE Seawater Cooling System

Apr 16, 2026

Leave a message

In March 2025, we received an RFQ from a UAE-based heat exchanger fabricator serving a district cooling project in Dubai industrial area.

The client is a mid-to-large fabrication company that regularly supplies:

Shell & tube heat exchangers

Condensers

Cooling system equipment

Their projects are typically delivered to contractors involved in district cooling and seawater circulation systems in the Gulf region.

How the Project Started

 

The inquiry came with:

A basic specification sheet

General dimensions of the tube plates

Material requirement: ASTM SB171 C46400

However, the detailed drilling drawings were not finalized yet.

Key Discussion Points

 

During email and technical discussions, the client focused on:

Whether the material is suitable for high salinity seawater

Internal quality (to avoid failure during tube drilling)

Flatness tolerance for CNC drilling machines

They mentioned a previous issue:

During drilling, some tube sheets showed minor porosity, causing rework and delays.

Final Confirmed Order Details

 

After 2 rounds of technical confirmation, the order was finalized as:

Material: Naval Brass C46400 (ASTM SB171)

Size:

Width: 1160 mm

Length: 3070 mm

Thickness: 40 mm

Quantity: 28 pieces

Production Weight

Gross production: ~11.0 MT

Net delivery weight: ~10.6 MT

Production Process

 

1. Raw Material & Melting

Controlled melting using induction furnace

Tin (Sn) adjusted to ~1.0% for marine performance

2. Rolling & Heat Treatment

Hot rolling for large-size plates

Intermediate annealing

Final stress-relief annealing

This step is critical because:

👉 Tube plates require stable internal structure for drilling thousands of holes

 

3. Surface Preparation

Before delivery:

Both sides were milled (not just raw plate)

Surface oxide layer removed

Edges trimmed

This reduces:

Tool wear during machining

Surface defects during drilling

Inspection & Quality Control

 

Inspection Timing

During production (in-process check)

Before dispatch (final inspection)

Actual Inspection Focus

Chemical composition (Sn content confirmation)

Ultrasonic testing for internal defects

Flatness measurement

Visual inspection

Observed Results

No internal defects detected by UT

Flatness within acceptable fabrication range

Surface condition suitable for machining

All results were included in:

EN 10204 3.1 certificate

Internal QC reports

Packing & Shipment

 

Packing Method

Wooden pallets (fumigated)

Each plate separated with soft protection

Moisture-proof film wrapping

Shipment

Loading Port: Shanghai

Destination: Jebel Ali Port, UAE

Containers: 2 × 20GP

Timeline

Production: ~3 weeks

Packing & booking: 1 week

Sea transit: ~3 weeks

✔ Total: ~6–7 weeks door-to-port

After Delivery

About 3 weeks after arrival, the client updated us during follow-up:

Tube drilling completed without abnormal tool wear

No leakage issues reported after assembly

Material consistency acceptable across all plates

They also mentioned:

"Compared with previous supply, machining stability is improved."

Why This Case Is Important

 

This case reflects a typical real scenario in Middle East projects:

Not a "perfect spec from day one" → drawings evolve

Real concern: drilling performance, not just chemistry

Key success factor: internal quality + flatness, not just standard compliance

Application Context

 

The tube plates were used in:

Seawater heat exchangers

District cooling systems

Industrial cooling loops

These systems require:

Long-term corrosion resistance

Stable mechanical performance

Reliable machining behavior

FAQ

 

1. Why do tube plates fail during drilling?

Usually due to internal porosity or uneven structure from poor rolling or casting.


2. Is C46400 suitable for seawater cooling systems?

Yes, it is widely used due to its tin content and corrosion resistance.


3. Do you supply machined tube plates or raw plates?

We can supply raw, milled, or fully machined based on drawings.


4. What is your typical delivery time to UAE?

Around 6–7 weeks including production and sea freight.

Contact Us

 

If you are sourcing Naval Brass Tube Plates (C46400 / SB171) for:

Heat exchangers

Cooling systems

Marine applications

We can support with stable quality and reliable delivery.

📩 Send your RFQ or drawings for a quick quote.

+8615769214734
office@dongmjd.com

 

Send Inquiry